大神秦先生气质短发美女,秦先生九部短发视频大全,黑客家庭监控视频360


86-21-58999552

Better design better quality better solution

Gas insulated Transformer System

YDSW Series

[Gas Insulated Transformer System]

SF6 insulated Test Transformers are especially designed for testing metal-clad switchgear (GIS) in the factory and in the field, and for testing the other substation equipment. It is also the portable and easy maintenance solution. The SF6 test transformers can be flanged directly to the GIS for testing which make the partial discharge test easy and quick. These systems are particularly suited for on-site tests of GIS after installation. In the factory, they are used to test sub-assemblies and components directly in the manufacturing line.

User Benefit

  • Small and compact in structure
  • Light and delicate
  • Special design for long-distance ?transportation ?
  • Direct connecting to the test object(GIS) by flange
  • High safety for operating
  • Large range of application with ?bushing for testing of “open“ equipment
  • Built-in HV measuring capacitor, standard capacitor, standard CT and PT.
主站蜘蛛池模板: 德保县| 弥渡县| 庄河市| 永善县| 辰溪县| 班玛县| 云梦县| 合江县| 遂宁市| 枣强县| 鹤壁市| 三门峡市| 巴彦淖尔市| 通州市| 竹北市| 洛阳市| 舒兰市| 横山县| 博白县| 孙吴县| 宜良县| 无棣县| 黄龙县| 静乐县| 漳州市| 体育| 隆德县| 白银市| 渭源县| 沙坪坝区| 五峰| 叙永县| 新竹县| 鹿邑县| 普兰县| 黑龙江省| 武威市| 黔东| 大石桥市| 贺州市| 大田县|